Verification of source system status and infrastructure - analysis of software versions, database disk layout, system status, etc.
Automation of homogeneous SAP system copies
One to two pre-tests are required, one of which should be performed on the production system. The additional load on the production system caused by the IMIG has been negligible. Split/mirror techniques allow many actions to be moved from the production machine to another machine.
After restarting the target system The SAP target instance has been started with a database that has been updated with content copied from the production database using fast and scalable disk array replication. The status of the target system now allows it to run without severe internal errors and disruption to the SAP landscape. However, the system does not have the same identity in the SAP landscape as it had before the update. That's why post-processing is required. UC4 Automated System Copy can handle most of the post-processing by restoring specific database content customizations (such as security settings, RFC targets, and operating modes) that were downloaded before the upgrade. Another goal in post-processing is to change the production system's logical system names to those used by the target system. Since these names usually need to be passed to numerous tables in a given system that have not yet been customized, SAP has the BDLS transaction that can be used to safely analyze and change logical system names. UC4 Automated System Copy can automate and accelerate this transaction by analyzing the underlying processes and executing them in parallel. It can also automate tasks such as reorganizing spools and instructing transport managers to process the delta transport list.
Efficient options for SAP system copies
With Automated System Copy for SAP, an SAP system copy can be scheduled and executed in a parallel mode, which has the advantage of reducing manual intervention to a minimum. In addition, daily work can continue as normal. Rehau had already been using the software provider's Business Automation platform for cross-platform scheduling of complex job chains since 2004. The existing installation was expanded to include the module for creating SAP system copies.
RFC data transfer was completed within 1 day. Effort decreases from 1st test to 2nd test to final copy.
Tools such as "Shortcut for SAP Systems" supplement missing functions in the area of SAP system copy.
Landscape copies refer to the update of not only one but a whole group of systems.
We guarantee consistent quality and reliable reproducibility through standardized processes and a high degree of automation.