SAP system copy Shutting Down the Target System

Direkt zum Seiteninhalt
Shutting Down the Target System
Solution infrastructure
Checklist for preliminary work: Comparison of database sizes (target system must be the same or larger), comparison of database versions, kernel, host agent (ideally the same software version), dump of kernel files (export via SAPINST), saves download via SWDC, compile RFC connection passwords, inform third-party system administrators, provide memory, hard disk on the system for database and software import. Perform database dump, if necessary with transaction log, if possible with downtime, then without jobs or stop running jobs with report BTCTRNS1. Adminsitration passwords (DDIC, DB-Admin, Winadmin), create system snapshots (recovery), perform database import.

An SAP system copy is not done in an hour. Due to the large amount of data in an SAP system, the individual steps can take a long time to complete. The export and the import do not always run without errors. Often one is held up by troubleshooting. Of course, the target system must be prepared before the actual copy can be performed: Setting up the server, installing the operating system and database software, downloading and copying the installation media. During the export, the source system cannot be used. Therefore, this task must be planned well and in advance.
Applicability of Systemcopy as a Service
Unsorted unloading: - By default, R3load sorts table data by primary key before export. This requires time and resources in the source system. Under certain conditions, this sorting can be omitted.

Internationally active companies that operate systems with several terabytes of data and hundreds of users in different time zones depend on high system availability. If necessary, the system is copied incrementally, table by table, on weekends and at night. Complete shutdown of the production system is best avoided altogether.

With "Shortcut for SAP Systems" you can sustainably relieve your administrators of time-consuming routine activities of an SAP system copy.

However, the selection of business objects is not possible in the standard system.

Although the actual copying process is completed in just a few hours, the manual post-processing - which includes, for example, adjusting parameters, users and rights, profiles, system settings and interfaces - can take up to a week.